Litchardon Cross Solar Farm

Location :
South-West of Barnstaple, Devon
Client :
Aura Power Limited (Built and Owned by Infinis)
Project Parameters :
49.9MWp Solar Farm
Project Description :

Engena undertook an initial feasibility assessment to determine the parameters of the proposed project. This included the design, layout within the landholding and specification of the array.

Engena scoped the development with North Devon District Council to determine the scope of work for Environmental Impact Assessment. As part of the EIA, Engena co-ordinated the public consultation process, designing and distributing site information brochures to the local community, and hosting a public exhibition.

Engena also managed the discharge of Conditions, including Non Material Amendment (NMA) and Minor Material Amendment (MMA) applications.

Notable Achievements :

Management of a number of complex EIA assessments resulting in minimised visual impact through iterative site design.

Technology :
Solar
Back to Projects Page